Capital Helicopters
Aircraft
Admin
C-GFAK Journey LogAirbus - AS350 DGrounded
Total Airtime Since New
20268
Total TQ Cycles
36575
Total NP Cycles
21130.72
Total NG Cycles
20697.55
Total Hook Hours
40.1
Total Hook Cycles
451
Hourly
  1. OVERSPEED LIMITER OVERHAUL-279.1
  2. undefined0
  3. PT GOVERNOR OVERHAUL9.1
  4. AIRBUS 500FH AIRWORTHINESS INSPECTION31.7
Calendar
  1. AIRBUS 600FH//3M SPECIFIC PERIODIC INSPECTION-41
  2. 12 MONTH CAP 602B STC INSPECTION-35
  3. HYDRAULIC FLUID REPLACEMENT (BELOW -15c)-26
  4. HYDRAULIC PUMP INSP-25
AF Special
  1. T/R DRIVE SHAFT BALANCE - PERFORM ONCE INSPECTION97.7
  2. LEBOZEC FUEL FILTER INSPECTIONn/a
  3. HYDRAULIC FLUID REPLACEMENT (BELOW -15c)n/a
  4. FORWARD SUSPENSION BARS - INSPECTIONn/a
Aircraft Journey Logbook
Start a New Entry
From
Date
W&B Temp Config No.
Entry Notes
Daily Inspection Carried Out IAWCAP 857C
Enter a Deferred Defect
Date Reported
Nature of Defect
Date Rectification Required (Optional)
Date Rectification Required N/A
Maintenance Entry
Work Order Number
Maintenance Entry Date
Maintenance Entry
Maintenance Release Conditions

The described maintenance has been performed in accordance with the applicable airworthiness requirements.

Independent control check for affected flight and engine controls