Capital Helicopters
Aircraft
Admin
C-GYKN Journey LogAirbus - AS350 SD2Airworthy
Total Airtime Since New
14741.6
Total TQ Cycles
45836
Total NP Cycles
14494.15
Total NG Cycles
12925.5
Total Hook Hours
764.8
Total Hook Cycles
293
Hourly
  1. LTS-101 - 50HR POWER CHECK29.9
  2. AIRBUS 150FH//6M SPECIFIC PERIODIC INSPECTION32.7
  3. AIRBUS 150FH AIRWORTHINESS INSPECTION32.7
  4. AIRBUS 150FH BASIC AIRFRAME INSPECTION32.7
Calendar
  1. HYDRAULIC FLUID REPLACEMENT (BELOW -15c)41
  2. AIRBUS 600FH//6M SPECIFIC PERIODIC - BLADE PIN GREASING144
  3. AIRBUS 150FH//6M SPECIFIC PERIODIC INSPECTION144
  4. ELT OPERATIONAL CHECK151
AF Special
  1. TAILBOOM TQ CHECK - PERFORM ONCE INSPECTION148
  2. LEBOZEC FUEL FILTER INSPECTIONn/a
  3. HYDRAULIC FLUID REPLACEMENT (BELOW -15c)n/a
  4. FORWARD SUSPENSION BARS - INSPECTIONn/a
Aircraft Journey Logbook
Start a New Entry
From
Date
W&B Temp Config No.
Entry Notes
Daily Inspection Carried Out IAWCAP 857E
Enter a Deferred Defect
Date Reported
Nature of Defect
Date Rectification Required (Optional)
Date Rectification Required N/A
Maintenance Entry
Work Order Number
Maintenance Entry Date
Maintenance Entry
Maintenance Release Conditions

The described maintenance has been performed in accordance with the applicable airworthiness requirements.

Independent control check for affected flight and engine controls